PROJECTED COSTS FOR SELECTED LOUISIANA VEGETABLE CROPS - 1997 SEASON



Table 41.A Estimated resource use and costs per acre for field operations, Watermelons (early), hybrid, transplants, plastic mulch,
one-row equipment, production parameters specified by Extension Horticulture Specialist, Louisiana, 1997.

OPERATION/

OPERATING INPUT

SIZE/

UNIT

TRACTOR
SIZE

PERF

RATE

TIMES
OVER

MTH

TRACTOR COST

EQUIP COST

ALLOC LABOR

OPERATING INPUT

TOTAL

COST

DIRECT

------

FIXED

--------

DIRECT

------

FIXED

HOURS

COST

AMOUNT

PRICE

COST

--------

----doll

ars-----

------

dollars

-------

dollars-

-------

Lime (spread)

cwt

1.00

Oct

6.6000

1.60

10.56

10.56

Disk 2R

6 ft

43

0.570

1.00

Oct

2.89

1.46

0.38

0.54

0.627

4.70

9.97

Disk 2R

6 ft

43

0.570

2.00

Mar

5.79

2.92

0.75

1.07

1.254

9.40

19.94

Hipper-fert 1R

3 ft

23

1.550

1.00

Mar

5.71

2.56

0.91

1.29

1.705

12.79

23.26

8-24-24

lb

400.0000

0.13

52.00

52.00

Plastic layer

5 ft

23

1.500

1.00

Mar

5.52

2.48

1.26

2.63

4.650

34.88

46.77

Plastic

roll

2.7000

60.00

162.00

162.00

Mulch plug mix trans

1 row

23

1.000

1.00

Apr

3.68

1.65

1.08

2.82

3.100

23.25

32.48

Watermelon plants

100

9.0000

15.00

135.00

135.00

Trailer utility

10 ft

23

1.000

1.00

Apr

3.68

1.65

0.40

1.43

1.100

8.25

15.41

Other labor

hour

1.0000

7.50

7.50

7.50

Boom sprayer

12 ft

23

0.190

1.00

Apr

0.70

0.31

0.26

0.28

0.209

1.57

3.12

Sevin

lb

1.0000

4.40

4.40

4.40

Bravo

pt

1.5000

6.38

9.57

9.57

Cultivator 1R

3 ft

23

1.530

1.00

Apr

5.63

2.53

0.40

0.57

1.683

12.62

21.76

Boom sprayer

12 ft

23

0.190

1.00

Apr

0.70

0.31

0.26

0.28

0.209

1.57

3.12

Benlate

lb

0.5000

15.80

7.90

7.90

Cult-fert 1R

3 ft

23

1.610

1.00

Apr

5.93

2.66

0.57

0.81

1.771

13.28

23.24

Nitrogen

lb

30.0000

0.24

7.20

7.20

Potash

lb

90.0000

0.12

10.80

10.80

Cultivator 1R

3 ft

23

1.530

1.00

May

5.63

2.53

0.40

0.57

1.683

12.62

21.76

Boom sprayer

12 ft

23

0.190

1.00

May

0.70

0.31

0.26

0.28

0.209

1.57

3.12

Malathion

pt

2.0000

2.88

5.76

5.76

Bravo

pt

2.5000

6.38

15.95

15.95

Cultivator 1R

3 ft

23

1.530

1.00

May

5.63

2.53

0.40

0.57

1.683

12.62

21.76

Boom sprayer

12 ft

23

0.190

1.00

May

0.70

0.31

0.26

0.28

0.209

1.57

3.12

Benlate

lb

0.5000

15.80

7.90

7.90

Other labor

hour

1.00

May

2.0000

7.50

15.00

15.00

Boom sprayer

12 ft

23

0.190

1.00

Jun

0.70

0.31

0.26

0.28

0.209

1.57

3.12

Bravo

pt

3.0000

6.38

19.14

19.14

Sevin

lb

1.0000

4.40

4.40

4.40

Trailer utility

10 ft

23

1.000

1.00

Jun

3.68

1.65

0.40

1.43

1.100

8.25

15.41

Harvest labor

hour

15.0000

7.50

112.50

112.50

Pickup truck

½ ton

1.000

1.00

Jun

4.16

3.36

1.000

7.50

15.02

Boom sprayer

12 ft

23

0.190

1.00

Jun

0.70

0.31

0.26

0.28

0.209

1.57

3.12

Bravo

pt

3.0000

6.38

19.14

19.14

Trailer utility

10 ft

23

1.000

1.00

Jun

3.68

1.65

0.40

1.43

1.100

8.25

15.41

Harvest labor

hour

15.0000

7.50

112.50

112.50

Pickup truck

½ ton

1.000

1.00

Jun

4.16

3.36

1.000

7.50

15.02

Trailer utility

10 ft

23

1.000

1.00

Jul

3.68

1.65

0.40

1.43

1.100

8.25

15.41

Harvest labor

hour

10.0000

7.50

75.00

75.00

Pickup truck

½ ton

1.000

1.00

Jul

4.16

3.36

1.000

7.50

15.02

Coulter

1 row

23

1.500

1.00

Aug

5.52

2.48

0.19

0.28

1.650

12.38

20.85

Other labor

hour

17.0000

7.50

127.50

127.50

Trailer utility

10 ft

23

1.000

1.00

Aug

3.68

1.65

0.40

1.43

1.100

8.25

15.41

Pickup truck

½ ton

1.000

1.00

Aug

4.16

3.36

1.000

7.50

15.02

Disk 4R

13.3 ft

68

0.150

1.00

Aug

1.13

0.63

0.43

0.61

0.165

1.24

4.03

TOTALS

75.66

34.58

-------

26.97

34.04

30.725

230.44

921.72

-------

1323.41

INTEREST ON OPERATING CAPITAL

41.34

UNALLOCATED LABOR

0.00

TOTAL SPECIFIED COST

1364.76

H-84



More intriguing information

1. The name is absent
2. The name is absent
3. Job quality and labour market performance
4. The name is absent
5. The name is absent
6. Fertility in Developing Countries
7. STIMULATING COOPERATION AMONG FARMERS IN A POST-SOCIALIST ECONOMY: LESSONS FROM A PUBLIC-PRIVATE MARKETING PARTNERSHIP IN POLAND
8. The name is absent
9. Change in firm population and spatial variations: The case of Turkey
10. The name is absent
11. The name is absent
12. PROJECTED COSTS FOR SELECTED LOUISIANA VEGETABLE CROPS - 1997 SEASON
13. Optimal Vehicle Size, Haulage Length, and the Structure of Transport Costs
14. Prizes and Patents: Using Market Signals to Provide Incentives for Innovations
15. The name is absent
16. Detecting Multiple Breaks in Financial Market Volatility Dynamics
17. National curriculum assessment: how to make it better
18. The Mathematical Components of Engineering
19. Name Strategy: Its Existence and Implications
20. Dynamic Explanations of Industry Structure and Performance