PRODUCTIVE SURFACE IMPLEMENTATION
The new infrastructure is formed out of the communication between a pedes-
trian based route, and a higher speed bicycle circulation. A productive surface
smooths the 2 together to increase continuity among not only several now im-
plied scars but several speeds also. Change in elevations along the surfaces ar-
ticulates the flux in programmatic intensities. The surfaces peak at predominant
transgressive intersections, hence the local being a dynamic anchor to program-
matic growth and thickening.
Taking a closer look at the productive surface, one can see the introduction of
depth over plasticity. First, the residents circulate freely atop the productive
surface. Then when the smoothing between the to speeds occurs an interstitial
pocket is activated, allowing for new program to infill. The new programs can
range across the entire spectrum including urban farming and/or office.
ACTIVE DEPTH
low speed pedestrian scars high speed cyclist scars
ACTIVE DEPTH
circulation surface
[30]