32

Figure 3.3 : Nonstationary Fluctuation Analysis of HCN currents (A) Five traces from an
ensemble, and (B), variance and mean computed from the ensemble. (Cl), In the rod, cell
attached patches gave an estimate of 663 ± 71 fS, with N=155 ± 42 channels in the patch
(std., n=3, two cells). (C2) Whole-cell patches estimated the conductance to be 766 ± 242
fS, with N=2214 ± 986 channels (std., n=6). (D) In the cone, cell attached patches yielded
an estimated conductance of 526 fS with 183 channels (n=l) present per patch. Estimates
were made from the coefficients of equation 2.4
More intriguing information
1. The name is absent2. Parent child interaction in Nigerian families: conversation analysis, context and culture
3. Optimal Private and Public Harvesting under Spatial and Temporal Interdependence
4. The name is absent
5. Improving Business Cycle Forecasts’ Accuracy - What Can We Learn from Past Errors?
6. A production model and maintenance planning model for the process industry
7. The name is absent
8. CONSIDERATIONS CONCERNING THE ROLE OF ACCOUNTING AS INFORMATIONAL SYSTEM AND ASSISTANCE OF DECISION
9. CGE modelling of the resources boom in Indonesia and Australia using TERM
10. Personal Experience: A Most Vicious and Limited Circle!? On the Role of Entrepreneurial Experience for Firm Survival