Figure 5. Estimates of θt for regional banks, with rd in eq. (8) being the cost of capital
— !—estimates
—■—95% upper
—Л—95% lower
→-1/n
Note: MVR estimates of θt of regional banks are shown with their 95% confidence interval. While rd in eq. (8) is the deposit interest rate in
Figures 2 and 3, the cost of capital is used for the data of rd in the estimation of this Figure.
33