Table 5.A Estimated resource use and costs per acre for field operations, Cabbage (fall), direct seeded, irrigated, fresh market,
one-row equipment, average yield, Louisiana, 1997.
OPERATION/ OPERATING INPUT |
SIZE/ |
TRACTOR |
PERF |
TIMES |
MT H |
TRACTOR COST |
EQUIP COST |
ALLOC LABOR |
OPERATING INPUT |
TOTAL | |||||
-D-I-R-EC--T-- |
-F--I-XE--D |
-D-I-R-EC--T-- |
--F-I-XE--D |
-H-OU-R--S- |
---C-OS--T |
-A-M-O-U-N-T-- |
--P-RI-C-E-- |
---C-O--S-T | |||||||
_-_-_-_--__--__- |
----dollars----- |
_-_-_--_-_-__ |
_d_o_l_la__rs__ |
_-_-_--_-_-__- |
_d_o_l_la__rs__- |
_-_-_--_-_-__- | |||||||||
Lime (spread) |
cwt |
1.00 |
Jul |
6.6000 |
1.60 |
10.56 |
10.56 | ||||||||
Disk 2R |
6 ft |
4 3 |
0.570 |
2.00 |
Jul |
5.7 9 |
20..9982 |
0.7 5 |
1.07 |
1.25 4 |
9.4 0 |
19.94 | |||
Disk-pre-1-2R Middle buster 1R Hipper-fert 1R |
6 ft 3 pftt 3 ft |
23 |
0.590 |
1.00 |
Jul |
2.17 |
0.49 |
0.70 |
4.87 |
1.250 0 |
3.75 |
4.69 |
9.21 4.69 | ||
2 3 23 |
1.530 1.550 |
1.0 0 1.00 |
JJuull |
5.6 3 5.71 |
22..5563 |
0.2 2 |
10..32 19 |
11..768035 |
12.6 2 12.79 |
21.31 23.26 | |||||
lb |
500.000 0 |
0.13 |
65.00 |
65.00 | |||||||||||
Hipper 1R |
3 ft |
2 3 |
10..4531 00 |
2.0 0 |
Aug |
11.2 6 |
5.0 6 |
1.0 1 |
1.44 |
3.36 6 |
253..3285 |
44.01 | |||
Row conditioner 1R |
6 ft |
23 |
1.00 |
Aug |
1.51 |
0.68 |
0.08 |
0.12 |
0.451 |
5.77 | |||||
Planter 1R |
3 ft |
23 |
1.500 |
1.00 |
Aug |
5.52 |
2.48 |
0.35 |
0.56 |
1.650 |
12.38 |
21.29 270.00 | |||
Cabbage seed |
lb |
110..00000000 |
270.00 |
270.00 | |||||||||||
Other labor |
hour |
1.0 0 |
Aug |
7.50 |
75.00 |
75.00 | |||||||||
Boom sprayer Ambush |
12 ft |
23 |
0.190 |
1.00 |
Sep |
0.7 0 |
0.3 1 |
0.2 6 |
0.28 |
0.20 9 |
1.5 7 |
01..025000 00 |
133..80 80 |
3.47 3.00 |
3.12 3.47 3.00 |
pt |
1.0000 |
2.00 |
2.00 |
2.00 | |||||||||||
Cult-fert 1R |
33% ltb |
2 3 |
1.610 |
1.0 0 |
Se p |
5.9 3 |
2.6 6 |
0.5 7 |
0.81 |
1.77 1 |
13.2 8 |
23.24 | |||
Ammonium Nitrate |
100.000 0 |
0.13 |
13.00 |
13.00 | |||||||||||
FCuurlrto-wfeirrtri1gRation |
acin |
1.0 0 |
Sep |
6.88 |
55.5 0 |
12.7.7010 0 |
15.00 |
2.0000 |
77.38 | ||||||
3 ft |
2 3 |
1.610 |
1.00 |
Sep |
5.9 3 |
2.6 6 |
0.57 |
0.81 |
13.28 |
23.24 | |||||
Ammonium Nitrate |
33% lb |
100.000 0 |
0.13 |
13.00 |
13.00 | ||||||||||
Boom sprayer |
12 ft |
2 3 |
0.190 |
1.0 0 |
Se p |
0.7 0 |
0.3 1 |
0.2 6 |
0.28 |
0.20 9 |
1.5 7 |
3.12 | |||
pt 3 pft |
12..000000 00 |
12.56 |
12.56 1.56 |
12.56 1.56 | |||||||||||
Cult-fert 1R |
2 3 |
1.610 |
1.0 0 |
Oc t |
5.9 3 |
2.6 6 |
0.5 7 |
0.81 |
1.77 1 |
13.28 |
23.24 | ||||
Ammonium Nitrate |
33% lb |
100.000 0 |
0.13 |
13.00 |
13.00 | ||||||||||
Boom sprayer |
12 ft |
2 3 |
0.190 |
1.0 0 |
Oc t |
0.7 0 |
0.3 1 |
0.2 6 |
0.28 |
0.20 9 |
1.5 7 |
3.12 | |||
pt |
0.250 0 |
13.88 |
3.47 |
3.47 | |||||||||||
Dipel |
pt |
1.0000 |
3.00 |
3.00 |
3.00 | ||||||||||
pt |
1.0000 |
2.00 |
2.00 |
2.00 | |||||||||||
Furrow irrigation |
acin |
1.0 0 |
Oc t |
6.88 |
2.000 |
15.00 |
2.0000 |
21.88 | |||||||
Boom sprayer |
12 ft |
2 3 |
0.190 |
1.00 |
Nov |
0.7 0 |
0.3 1 |
0.26 |
0.28 |
0.209 |
1.57 |
3.12 | |||
Ambush |
pt |
0.250 0 |
13.88 |
3.47 |
3.47 | ||||||||||
Dipel |
pt |
1.0000 |
3.00 |
3.00 |
3.00 | ||||||||||
pt |
1.0000 |
2.00 |
2.00 |
2.00 | |||||||||||
Furrow irrigation |
acin |
2 3 |
1.000 |
1.00 |
No v |
7.3 6 |
3.3 1 |
6.8 8 |
2.86 |
22 ..2000 00 |
11 65..50 00 |
2.0000 |
21.88 30.82 | ||
Harvest labor |
hour |
1.00 |
Dec |
32.000 0 |
7.50 |
240.00 |
240.00 | ||||||||
Packing labor Packing sacks |
hour |
1.00 |
Dec |
11.0000 |
7.50 |
82.50 |
82.50 | ||||||||
each |
450.0000 |
0.50 |
225.00 |
225.00 | |||||||||||
PDiicskkup2Rtruck |
½ ton 6 ft |
4 3 |
10 ..5007 00 |
10.0 0 2.00 |
Dec |
5.7 9 |
2.9 2 |
41.5 6 |
33.63 1.07 |
110..205040 |
75.0 0 9.40 |
150.19 19.94 | |||
TOTALS |
- |
------- 71.32 |
--3-2-.6--7 - |
------- 70.31 |
-1-0-2.-0-9- |
-3-6-.-36--1 - |
------ 272.71 |
-1-0-5-1.--28- |
-1-6-00-.-3--8 | ||||||
INTEREST ON OPERATING CAPITAL |
35.88 | ||||||||||||||
UNALLOCATED LABOR |
0.00 | ||||||||||||||
TOTAL SPECIFIED COST |
1636.26 |
H-12
More intriguing information
1. Evaluating the Success of the School Commodity Food Program2. The duration of fixed exchange rate regimes
3. The name is absent
4. The name is absent
5. Motivations, Values and Emotions: Three Sides of the same Coin
6. The name is absent
7. THE AUTONOMOUS SYSTEMS LABORATORY
8. Comparison of Optimal Control Solutions in a Labor Market Model
9. An Empirical Analysis of the Curvature Factor of the Term Structure of Interest Rates
10. Temporary Work in Turbulent Times: The Swedish Experience