U.S. Federal Power Commission, Statistics of Privately Owned Electric Utilities in the U.S.
- Classes A and B, Washington D.C., annually.
U.S. Federal Power Commission, Steam Electric Plant Construction Cost and Annual Pro-
duction Expenses, Washington, D.C., annually.
Yaisawarng, S. and J. Klein, The Effects of Sulfur Dioxide Controls on Productivity Change
in the U.S. Electric Power Industry, Review of Economics and Statistics 76, 447-
460 (1994).
Zellner, A., The Finite Sample Properties of Simultaneous Equations’ Estimates and Es-
timators Bayesian and non-Bayesian Approaches, Journal of Econometrics 83,
185-212 (1998).
Zellner, A. and J. Tobias, Further Results on Bayesian Method of Moments Analysis of the
Multiple Regression Model, International Economic Review 42, 121-140 (2001).
31
More intriguing information
1. Evaluating the Success of the School Commodity Food Program2. The name is absent
3. Change in firm population and spatial variations: The case of Turkey
4. Elicited bid functions in (a)symmetric first-price auctions
5. Sustainability of economic development and governance patterns in water management - an overview on the reorganisation of public utilities in Campania, Italy, under EU Framework Directive in the field of water policy (2000/60/CE)
6. The name is absent
7. Fortschritte bei der Exportorientierung von Dienstleistungsunternehmen
8. A Study of Prospective Ophthalmology Residents’ Career Perceptions
9. Word searches: on the use of verbal and non-verbal resources during classroom talk
10. PER UNIT COSTS TO OWN AND OPERATE FARM MACHINERY